Bob Jones Building

Degadur Tile overlay system with tiles in situ. Tile grout was failing resulting in efflorescence, The Degadur overlay system, with detailing to facade resulted in complete water tight result with a decretive finish.

Degadur overlay system over failing asphalt at the Bob Jones Building.

Previous
Previous

Volt Apartments

Next
Next

UTS Building